MATMEC
ENGINEERED METAL PRODUCTS & FABRICATION
QUALITY & CONTROL
QUALITY STARTS BEFORE PRODUCTION
Drawing, interfaces, material and inspection criteria are reviewed before manufacturing release.
CONTROL FLOW
DRAWING → MATERIAL → PROCESS → INSPECTION
MATERIAL
Material requirements and available certification scope are defined against the RFQ.
DIMENSIONAL CONTROL
Critical interfaces and drawing dimensions are identified for verification.
WELDING CONTROL
Weld details, sequence and acceptance requirements follow approved project information.
INSPECTION
Inspection and NDT scope are defined only where required and available.
DOCUMENTATION
Inspection records and project-specific documentation follow the agreed scope.
FINAL RELEASE
Manufacturing and documentation requirements are checked before dispatch.
RFQ
HAVE A DRAWING OR PROJECT?
Send your technical documentation for manufacturing review and quotation.
MATMEC
Engineered Metal Products & Fabrication
İzmir, Türkiye · project@matmec.com