Skip to main content
QUALITY & CONTROL

QUALITY STARTS BEFORE PRODUCTION

Drawing, interfaces, material and inspection criteria are reviewed before manufacturing release.
CONTROL FLOW

DRAWING → MATERIAL → PROCESS → INSPECTION

MATERIAL

Material requirements and available certification scope are defined against the RFQ.

DIMENSIONAL CONTROL

Critical interfaces and drawing dimensions are identified for verification.

WELDING CONTROL

Weld details, sequence and acceptance requirements follow approved project information.

INSPECTION

Inspection and NDT scope are defined only where required and available.

DOCUMENTATION

Inspection records and project-specific documentation follow the agreed scope.

FINAL RELEASE

Manufacturing and documentation requirements are checked before dispatch.
RFQ

HAVE A DRAWING OR PROJECT?

Send your technical documentation for manufacturing review and quotation.
MATMEC
Engineered Metal Products & Fabrication
İzmir, Türkiye · project@matmec.com